.

Sunday, March 31, 2019

Advantages And Disadvantages Of Prefabrication As Construction Method Construction Essay

Advantages And Disadvantages Of Prefabrication As Construction Method Construction EssayThe aim of this research is to put up whether an increase enforce of off-site even up leave alone train a much(prenominal) force efficient ho use stock, as the UK gets closer to its nose apprizedy decrement deadline. The objectives of this national atomic number 18To identify the key advantages and disadvantages of prefabrication as a plait parade, and to usher how these atomic number 18 achievable comp argond to traditional regularitys.To identify the sure requirements for verve efficiency in rising fig ho subprograms.To identify the requirements of the mood convince accomplishment 2008 and how this volition guess the manifestation fabrication.To establish the electric modern use and opinion of prefabrication/off-site lying in the formulation industryThe UK is de jure bound to cut its green house gas ventings beneath the climate Change enactment 2008. These cuts be a 34% diminution by 2022 and an overall 80% decline by 2050, compargond to the service line discharge value from 1990.This is not a scientific quantitative study of the in reality force efficiencies of the look manner, but to a greater extent of an in-depth qualitative study of the features of prefabrication. This entrust be make by inspectioning existing literature on the depicted object and comparing this to actual opinions and use in the gimmick industry. These opinions and the level of carrying out of prefabrication within the winding industry exit be established using questionnaires. From this analysis it is hoped that at that place are environmental benefits to using off-site fashion/prefabrication. This should consequently be shown in the wind industry by its more and more use.With the UKs housing stock producing well-nigh 30% of the UKs total degree centigrade emissions, it is a sector where huge environmental gains endure be do (House of ballpark 2005). Although the Climate Change Act 2008 is not specifically aimed at the construction industry, the Chief executive director of the military commission on Climate Change, David Kennedy has called for action in four key areas the method by which electricity is produced, increasing the use of electric transport, reducing the light speed footprint of farms in the UK and an increase in the construction of verve efficient homes (Adam 2010).M any reports, especially from prefabrication manufacturers themselves state the benefits of off-site construction over traditional methods. These include an increase revive of construction, interrupt health and safety conditions on-site, break in quality of final product and a lesser total cost when economies of scale apply. However when observing construction sites off-site construction seems to not be included and traditional methods of construction seem to dominate. This study aims to find out the actual use of prefabricated, of f-site components within the industry, and the reasons professionals urinate for either using, or not using this construction method.The hypothesis for this study states that the current use of off-site manufactured components leave alone confirm a positive correlation to the perceived benefits from using them. For moral if the perceived benefits of the using off-site manufactured components are great, then it is predicted that their use will be vulgar within construction. Conversely if the features of prefabrication are not greatly beneficial compared to traditional methods, it is predicted that the use of off-site manufacture in the construction industry will be unhopeful. These assumptions gift been made over payable to common reasoning, creation that if something is more beneficial than another, it will be elect more often. slightly basic problems that whitethorn occur in this crabbed research project could hoard the participant trope. For example because this is a microscopic scale research project, only a reasonably small quash of professionals will be contacted to complete the questionnaire. This will mean that the results from the entropy sedate sewer not be generalised to the rest of the construction industry. another(prenominal) problem may occur with the fruit rate of the questionnaire. The expected return rate is 30% this agent that from the 60 questionnaires sent, around 18 are expected to be returned. Another problem may occur because the discipline produced about the systems is usually produced by the manufacturers themselves, and may be biased.The hypothesis will be accepted if the primary literature search states that there are clear advantages to prefabrication, and the industry study shows that it is being increasingly utilize as a construction method. It will be rejected if there is no significant correlation between the reported benefits and the use of the construction method.This oratory will withstand the followin g structure. First a literature review will be underinterpreted to establish all known information on the subject area. This section will include analysis of literature to establish what the stated benefits of prefabrication are compared to traditional methods of construction. Examples of each construction method will be analysed and areas where the benefits or disadvantages arise will be graduate(prenominal)lighted. The Climate Change Act 2008 will be reviewed to ascertain the requirements the UK is legally bound to fulfil. The current zip efficiency requirements will be taken from a study of the build prescripts.Then a methodology will be created which will involve formulating questions that soak up not been answered from the literature review. A participant flesh will be identified and a justification for its alternative made. The selection and the precept behind the research method chosen will then be made.The questionnaires will then be sent out and the data analysed f rom the information collected. A series of tables and graphs will be produced to identify any significance in the results collected.A discussion will then take place to deduce wherefore the data collected has been produced and the impact it may fill on the information we already know.Conclusions will then be made that will summarise the findings and show any limitations to the study that should be rectified if done again. This section may bluelight areas for further research. At the end of the document, a section of references and appendices will be included.2. Literature review article2.1 PrefabricationPrefabrication is a term used to describe the construction of constructs or twist components at a location, usually a mill, remote from the building site. (Emmitt, S. 2010)Prefabrication can similarly be known as off-site prefabrication (OSP), off-site manufacture (OSM) and as a modern method of construction (MMC) (Taylor 2010). It has been used in mass intersection of housi ng since the early twentieth century (Arieff, A 2002). Prefabrication need only affect the construction exploit and not the end-product (BRE 2001).It is common practise nowadays to use prefabricated components much(prenominal) as trussed roofs and precast concrete sections, nevertheless for the purposes of this study, the terms prefabrication and off-site manufacture are utilize to bigger components, such as fully fitted toilet pods shown in emblem 1ab and external wall blocks with windows preinstalled and internal finishes applied.Figure 1a seed http//www.archiexpo.comFigure 1bSource http//www.stcinc.net/bahamar.htmlFigure 1a/1b a prefabricated toilet and kitchen pod, ready to be lifted and secured on-site. digit and performance problems in the past check hindered the use of prefabrication, so it is recyclable to study the history to see if the kindred problems exist today.The mass exertion of prefabricated components started in the early twentieth century however there ar e examples of its earlier use, including the UKs first iron bridge constructed in 1779 at Colebrookdale (BRE 2001).The study push for the use of prefabrication in the housing market occurred after two the First and Second World War (Arieff, A 2002). This was due to the period of reconstruction to account for the lack of new buildings constructed during the conflict, and the existing buildings that were damaged as a consequence of the conflict. Prefabrication suited the needs of the cartridge clips as it provided a fast and affordable stem to the housing shortage. It addressed the lack in construction skills that existed after the wars and provided jobs in the factories for some people. It also provided a solution as to what to do with the large facilities that were constructed for armament manufacture during the war. Prefabrication enabled effective hearty management, reducing wa portray. This was important at the time as there was a shortage in materials after the massive i nstruction on production of components used for war. In October 1944 the Housing (Temporary Accommodation) Act was passed that gave the establishment the power to elapse 150M on the construction of temporary housing. This led to around 157,000 temporary houses being erected from 1945-1948 (BRE 2001). This record is less then was anticipated by the programme and after led to the poor perception of the construction method.Factors that have also slowed increment of off-site manufacture include the poor quality of earlier systems, the problem convolute with the maintenance of systems installed after the war and the poor attention to peak that was incorporated into their design also hampered the development (BRE 2001).Due to the difference in physical construction paradees compared to traditional construction, prefabrication produces the opportunity to capitalise on many benefits. on that pointfore new OSM systems boast many advantages from using off-site manufacture as a primar y construction method.These include an increased speed of construction. A case study from modular building contractors Unite standard Solutions reports of a 76 module, 32 self contained flats scheme in capital of the United solid ground that was fully erected in 8 days (Unite 2009). A study undertaken by Davis Langdon and Everest found that for the Peabody Trusts Murray Grove project in East London, a parsimoniousness of 18 weeks was achieved compared with a conventional project (Davis Langdon Everest 2002).Due to the factory conditions in which the components are constructed, a higher level of quality can be incorporated into the end product. Problems occur on-site when adverse weather conditions affect the quality of components such as concrete. When the weather is adversely hot, too oft water evaporates from the concrete whilst it is solidification. If the temperature is too low the chemical reactions that happen during curing will take place too slow. Both these extremes w ill have detrimental effects on the compressive strength of the cured concrete (Mittelacher 1985). There is also less movement and shrinkage when the project is completed that means that the quality of the finishes and the level of attention to detail permissible mean that snagging time is cut at the end of the project. This is the added time of making sure the stopping point quality is satisfactory.The use of prefabrication can improve the health and safety conditions on-site. This done by eliminating the congestion on site as tumesce as the amount of adding from height that is necessary. This is because anything that is needed to be done at height can be done in the factory conditions on platforms under correct supervision. A paper produced by the Health and gum elastic Executive reports that HSEstatistics indicate that fatal accidents in construction are five dollar bill times more likely than in the manufacturing sector. (Taylor 2009)The main advantage that makes OSM appl icable to this study is the environmental benefits it is reported to bring to a construction project.With a higher standard of quality, optimum thermic efficiencies and air permeabilitys can be achieved consistently using OSM. When construction takes place on-site, there is more of a chance of thermal bridges and insufficient workmanship to subdue the thermal efficiencies of a component. In a factory, standardised components can be used in a controlled environment with correct supervision to achieve tokenish tolerances in products.Less profligacy is produced during the manufacture stage compared to traditional methods of construction. This is due to lean processes and the efficient use of resources. The opportunity to re-use and recycle materials is also increased due to the controlled factory conditions. The factory environment means that components are produced flop the first time, limiting waste. Another benefit is that the final design is locked at an early stage, so the opp ortunities for variations on-site are limited, and so less waste is generally produced.New OSM systems are constructed of a light weight nerve frame, which has a reasonably low amount of embodied energy compared to materials such as concrete (Greenspec 2010).Clearly systems could be used that are more harmful to the environment than traditional methods of construction, however reports show undoubtedly that there is more potential to produce more environmentally friendly buildings using OSM.However there are disadvantages to using OSM. One contentious medical prognosis is the cost. There are two sides to the argument the first being that the process of using prefabrication is more expensive. A study by Davis Langdon showed that there is on average a cost premium of using OSM of between 10% and 25% (Rawlinson 2009). Others accept the premium in cost, however believe the personnel casualty in money is regained due to the lessen construction time and reduced snagging time due to the better quality. They also argue that the components are better designed for ease of maintenance and repair and so a deliver can be made in the big term. The report by Rawlinson (2009) does state that the costs are regained through these savings for some or all of the costs, but does not quantify the amount.Other problems include the high set up costs of using the construction method. The majority of the construction work that is undertaken in the UK uses traditional methods of construction. Therefore there is only a very small skill base of trades people who are fitted with the OSM processes. Although the training to learn these skills is not rigorous, over the entire United Kingdom it would amount to a sizeable sum. The cost of establishing prefabrication facilities is also very high and so this may be a factor as to why the construction method is not widely used.The esthetics of OSM may also be a factor that has reduced the use of the construction process throughout the UK. Th e poor perception to past systems and very modular design of many OSM structures mean that the construction method does not suit everyones tastes.2.2 The Climate Change Act 2008The Climate Change Act 2008 is a scrap of legislation that legally binds the United Kingdom to reduce its green house gas emissions. The main green house gas (GHG) which causes concern is nose candy dioxide (C02). The reduction targets are an overall GHG emission cut of 80% by 2050, with an interim deadline of a reduction of 34% by 2022. This is compared to a baseline figure from 1990 of 593 million tonnes of carbon copy dioxide (MtC02) (National Audit Office 2008). Therefore a reduction of 34% is an emission level of 391MtC02 in 2022, and a proposed emission of 119 MtC02 for the year of 2050. The other GHGs named in the Act are methane, nitrous oxide, hydrofluorocarbons, perfluorocarbons and mho hexafluoride (Climate Change Act 2008 s24.1). The Act also makes provisions for other gases to be added to thi s list by the Secretary of evince if they become of interest (s24.1g). partitioning 32.1 of the Act states that an independent body mustiness be created, named the Committee on Climate Change. The duties of this body include providing advice on whether the GHG reduction targets should be neutered and to what extent in order to meet them (s33), advising on the carbon cypher (s34), advising on aviation and shipping emissions (s35), presenting progress reports to Parliament (s36) and to provide advice and tending upon request (s38).The Act states that the Secretary of State, currently Chris Huhne, must set a carbon budgeting system. This is the process of stating the allowable GHG emissions within 5 year periods. This figure is set with the advice of the Committee on Climate Change (s9). Three of these periods are set at a time. The first 3 periods are 2008-2012, 2013-2017 and 2018-2022. The following 3 budget caps must be set by June thirtieth 2011 (Climate Change Act 2008 s4.2a +b).The United Kingdom is the first country to legally show its intentions for tender its carbon emissions. The Act is aimed to pave the way for cutting emissions for other countries. In a video made by the Committee on Climate Change about building a low-carbon economy, Martin occlude member of the Intergovernmental Panel on Climate Change says that the Act will set a landmark example to what other countries can do. It is hoped that the Act will increase the UKs energy awareness and help improve our carbon management. The Government hopes that this will move the UK into a low-carbon economy.It is hoped that because the Act is a long term measure, covering 40 years, it will encourage businesses to invest heavy in low carbon technologies, as there is reassurance that returns will be made from investments now.It has been established that the main area where the UKs GHG emissions can be reduced is in electricity production. In EcoCentroGen newsletter August 2009, it is reported that the Government predicts that around 40% of electricity will be from low carbon sources by 2020. However significant savings in emissions can be made in both the transport and housing industry. In the same newsletter, it is reported that by 20207 million homes will be mixed in energy saving schemes, and more than 1.5 million households will be supported to produce their own clean energyThe Chief Executive of the Committee on Climate Change, David Kennedy, highlighted four key areas where emission cuts can be made. These were electricity production, housing, transport and farming (Adam 2010). With about 27% of the UKs energy being consumed in the housing sector, there are substantial savings to be made (Farookhi 2008). Producing more energy efficient homes will reduce this figure. The Government will try to implement these savings through a variety of means. Examples of these may be through more stringent twist Regulations, financial initiatives for implementing renewable energy te chnologies, such as grants for installing solar panels or feed-back tariffs or by raising discharge prices.There is however some concern and criticism over the rate of decarbonisation the Act implies. The Kaya identity operator is an equation that shows the relationship between energy and human factors and the effect the combine of these has on total carbon emissions of a country. This equation states that the only method for reducing carbon emissions is to reduce either population, per capita gross domestic product or the carbon intensity of the UKs economy. Governments tend not to manipulate population or GDP per capita as they do not receive public backing and crock up economic growth. Therefore Government policies for reducing carbon emissions tend to focus on reducing the carbon intensity of the economy, and the Climate Change is no exception. It is argued that by using the Kaya Identity, the Climate Change Act 2008 has not taken into consideration the effects of population growth and per capita economic growth. It is argued that with the effect of a growing population and economic growth, to meet the reduced emission targets of 2050, the UK would have to reduce the energy intensity and increase energy efficiency by a rate of 5.4% a year (Pielke Jr 2009). Pielke Jr argues that for this rate of decarbonisation to occur, the UK would have to have the same carbon efficiency as France achieved in 2006, by 2015. This would involve constructing around 30 nuclear power plants. It is argued that this is simply not feasible.Pielke Jr concludes by pointing out these unachievable targets have been set as the Acts approach to emissions reduction is backwards. Opposed to assessing what the ultimate rate of decarbonisation the UK is capable of achieving, and setting targets suitable to this, the Act has set practically impossible targets, and only now they have been made in law, the UK is thinking of ways of achieving them.2.3 expression RegulationsThe current Bui lding Regulation requirements are of interest to this study as they show the current energy efficiency standards of houses being constructed today. They will also be the means by which the Government will enforce changes in construction practice in order to meet the GHG emission reduction targets.Building Regulations are statutory instruments that are used to enforce the relevant legislation that dictate nifty standards of construction and safety in England and Wales. Schedule 1 of the Regulations consists of fourteen sanction documents that cover the following subjects (http//www.planningportal.gov.uk/buildingregulations) affair A Structural safety break away B Fire safety unwrap C Site proviso and resistance to contaminants and moisturePart D Toxic substancesPart E Resistance to soundPart F VentilationPart G Sanitation, hot water safety and water efficiencyPart H Drainage and waste disposalPart J Heat producing appliancesPart K Protection from fallingPart L Conservat ion of fuel and powerPart M Access to and use of buildingsPart N Glazing safetyPart P Electrical SafetyThe Building Regulations are the statutory instruments of the Building Act 1984. The Act makes provision for the Secretary of State to update or create new regulations for the purposes of health and safety, increasing the preservation of fuel or power and preventing waste of water (Building Act 1984 s1).Building Control was first used in London in 1189. This involved the enforcement of rules dictating party walls, rights of light and drainage. Around this time the introduction of consideration in design for empty-resistance buildings and means of escape in case of a fire were developed (Stephenson 2005). After the Fire of London in 1666, the first building Act became law. This Act made provisions for surveyors to be selected to ensure that the regulations we obeyed on construction sites.In 1984 the Building Act was passed and consolidated the various introductory regulations t o produce one main piece of legislation.Most building work requires Building Approval. This is the process of checking work done onsite complies with the Building Regulations. The duty of checking conformance with the Regulations is undertaken by Building Control Bodies. These approved inspectors can be from the topical anesthetic Authority or they can be from the private sector (http//www.planningportal.gov.uk).Some forms of construction are exempt from the Building Regulations. These include porches, conservatories and some garages which are all subject to size, use, description, design, location and other requirements. If these requirements are not purely met then the construction work requires building approval (http//www.kingston.gov.uk/browse/environment/buildingcontrol).The debt instrument of following the Building Regulations falls to the person carrying out the work. To whom this responsibility falls to should be confirmed at the start of the work (Building Regulations explanatory Handbook s2.4 2005).The Building Regulations state the allowable U-value of components to be used in new dwellings. U-values show the ability of a building component to contract heat. Approved document L1B 2000 outlines the target minimum U-value of building components. To increase the energy performance of the overall building, the U-values of components must be as low as possible. Under Part L 2002, the U-Value of new build cavity walls is 0.35 W/m2K. For a comparison a 225mm solid brick wall has the average U-Value of 2.0 W/m2K (http//www.syec.co.uk/factsheets/U_value_factsheet.pdf)The Building Regulations also state the allowable air permeability of new build dwellings. This is the rate of air leaving the building as well as the rate of new air entering the building. A low air permeability figure means that the air will not escape and energy will not be wasted. Under Part L of Schedule 1 of the Building Regulations the allowable air permeability is stated as10m3/hm2 at 50Pa.These figures are relevant to this study as the benefits of a higher quality product coming from a factory environment, mean that these figures may be more easily achieved using prefabrication and off-site manufacturing techniques.2.4 Literature Review SummaryFrom the research of the respective literature the benefits of prefabrication have been presented. These are the increase in quality, speed of construction, health and safety on site and the environmental benefits these bring. The disadvantages the OSM produces as a construction method are an increase in the project cost, a potential unattractive aesthetic aspect and the high set up costs associated with new OSM facilities.The Building Regulations have been studied to show the standard to which new homes are create as a comparison to OSM.The targets of the Climate Change Act 2008 have been established. These are a 34% reduction by 2022 and an overall 80% reduction by 2050 compared to a baseline figure from 1990. In or der for the UK to meet these targets, four key areas have been highlighted for action one of these is the energy efficiency of the UKs housing stock. Studies have shown that these targets are very ambitious and for them to be achieved a radical change in how we design and build houses must be undertaken. From identifying the benefits of prefabrications, an argument can be made that this construction method could be the answer to producing more energy efficient homes.A methodology must now be formulated in order to collect data from the construction industry. This will involve identifying the participants for the study and a method for roll up data from them. It will also involve creating questions that will produce the required data.3. Methodology3.1 Scope of the ChapterThis chapter will establish the method for collecting the data relevant to this study. It will set out the research aims and the rationale behind their selection. A section that explains the types of information stu died will be included as well as an explanation of the participant design. A method for the analysis of the collected data will then be established.3.2 Statement of Research AimThe aim of this research is to establish whether an increased use of off-site manufacture will produce a more energy efficient housing stock, as the UK gets closer to its carbon reduction deadline. The objectives of this study areTo identify the key advantages and disadvantages of prefabrication as a construction method.To identify the current requirements for energy efficiency in new build houses.To identify the requirements of the Climate Change Act 2008 and how this will affect the construction industry.To establish the current use and opinion of prefabrication/off-site manufacture in the construction industry3.3 Rationale of the ResearchWith the UKs housing stock producing approximately 30% of the UKs total carbon emissions, it is a sector where huge environmental gains can be made (House of Commons 2005) . Off-site manufacture enables an better finished quality so that optimum thermal efficiencies and air permeabilitys can be achieved consistently. Other benefits are that less waste is produced during the manufacture stage compared to traditional methods of construction and there is an increased opportunity to re-use and recycle materials in factory conditions. With the UK legally bound to reduce its GHG emissions by 34% by 2022 and 80% by 2050, action is required to make housing more energy efficient.3.4 Secondary ResearchTo establish the advantages and disadvantages of prefabrication, the current Building Regulations for energy efficiency and the targets set by the Climate Change Act 2008, a literature review was undertaken. This was done to establish all the information that is already known on the topic and to highlight any areas of study that have already been conducted.3.5 Primary Research3.6 Research Sample3.7 Method of depth psychology3.8 Summary of Chapter

No comments:

Post a Comment